OAF – Audit · Tax · Advisory

Feasibility Studies in Egypt

A feasibility study your bank, board or investment committee can approve in the first round, with returns calculated after Egyptian tax. It starts with a viability check in 7 to 10 working days, so a project that doesn't work stops before you pay for the full study.

Financial Feasibility Studies and Market Analysis - OAF Firm

Most feasibility studies are commissioned after the decision has effectively been made, and it shows. Assumptions are chosen to support the outcome, sensitivity is glossed over, and the report justifies a number instead of testing it. Then the bank or the investment committee asks the questions the study avoided, and the project goes back for a second round.

For a foreign investor, there is a second gap: most studies stop at profit in Egypt. They ignore corporate tax, withholding tax on dividends and the exchange rate, so the return your board approves is not the return that reaches you.

We build studies the other way: assumptions written down and agreed before the model is built, scenarios that show the real range of outcomes, and returns calculated after Egyptian tax, in EGP and USD. If the honest answer is that the numbers don't work, that is what the report says.

The Bank-Ready Feasibility Study

What you get, in two phases:
• Phase 1: Viability check (7 to 10 working days, depending on the project's size). Market size, unit economics, investment cost range, licensing blockers and the tax position, enough to see whether the project can work. If it can't, you stop here and pay for Phase 1 only.
• Phase 2: Full feasibility study. Market, technical, financial, tax and regulatory analysis, built to the standard your bank, board or investor will apply, on a timeline agreed in writing.

What our feasibility studies cover

• Market study: demand, competitors, pricing and realistic market share in Egypt and your export markets.
• Technical and operational study: location, equipment, capacity, staffing and the operating model.
• Financial model: investment cost, operating costs, cash flow, NPV, IRR, payback and break-even, in EGP and USD, with scenarios and sensitivity analysis.
• After-tax returns: corporate tax, withholding tax on dividends and treaty relief, so you see what actually reaches your home country. See how this works in Tax Planning.
• Incentives and location: whether the project qualifies for investment incentives, free zones or economic zones, and what it takes to keep them.
• Regulatory and licensing: the approvals, licences and timeline the project needs before it can operate.
• Risk and mitigation: what could go wrong, how much it would cost, and what reduces it.

Included with every study

• Assumptions register: every key assumption written down and agreed with you before the model is built.
• The financial model in Excel: yours to keep and update as the project moves.
• Arabic and English versions: Egyptian banks and authorities usually need Arabic, foreign boards and investors usually need English.
• Lender or board presentation: a senior advisor presents and defends the study if needed.
• One round of revisions after your bank's or board's comments, included.

Who our studies are for

• Foreign and Gulf investors planning a specific project in Egypt: a factory, a production line, a real estate or tourism project.
• Companies applying for bank financing or investor funding.
• Boards and investment committees approving a new branch, product line or acquisition.
Deciding whether to enter Egypt at all? Start with the Egypt Go/No-Go Decision.

Our commitments

• An honest answer. If the numbers don't work, the report says so.
• A fixed fee for each phase, agreed in writing before work starts.
• A written timeline built around your bank, board or investor deadline.

Why investors choose OAF for feasibility studies

OAF is led by Dr. Mansour Etman, Board Member of the Egyptian Association of Auditors, with more than 35 years of practice and over 200 clients, including foreign investors and multinationals entering the Egyptian market. Our tax team includes former Directors-General of the Egyptian Tax Authority, so the tax side of every study reflects how the law is applied in practice.

Need ongoing financial planning after launch? See Financial Consulting. For context, read Investing in Egypt 2026 and Cost of Setting Up a Company in Egypt.

Key benefits

Our clients

Trusted By Leading Companies Operating in Egypt

EG Insurtech
Ahmed Abdelgawad Law Firm
Delta Development
Canadian Arabian Co. for Paper Industries
United Dabbagh Group

Swipe sideways to see more client logos.

Our client relationships are governed by strict confidentiality agreements. References and case details are available to qualified prospects upon request.

Frequently asked questions

What does a feasibility study in Egypt include?

A market study, a technical and operational study, a financial model with cash flow, NPV, IRR, payback and break-even, the tax and incentives position, licensing requirements, and a risk and mitigation section.

Will banks in Egypt accept your feasibility study?

We build each study to the format and standard the specific bank or investor expects, and agree that standard with you at the start. The final credit decision is always the bank's.

Is the study in Arabic or English?

Either or both. Egyptian banks and authorities usually need Arabic, while foreign boards and investors usually need English. We deliver whichever versions you need.

How long does a feasibility study take?

The viability check takes 7 to 10 working days, depending on the project's size. The full study's timeline depends on the project and how quickly data and cost quotes are available, and we agree it in writing based on your bank, board or investor deadline.

What is the difference between a feasibility study and the Egypt Go/No-Go Decision?

The Go/No-Go Decision tells a foreign company whether entering Egypt makes sense and which structure to use. A feasibility study goes deeper into one specific project, its market, operations and financials, usually for financing or board approval.

How are fees set?

Fees are fixed per study and depend on the project size and scope. You get a written quote after the scoping call, before any work starts.

What if the viability check shows the project won't work?

Then you stop there and pay for Phase 1 only. You get a written summary of why the numbers don't work, which is often what an investor needs to adjust the project or walk away before committing capital.

Will Your Project in Egypt Pay Off? Find Out Before You Commit

Book a call with a senior advisor. Tell us about the project and who needs to approve it, and we'll send the scope and a fixed fee for the viability check in writing within 1 business day.

Book a Call WhatsApp

Ready to expand into Egypt? Let's talk.

Schedule a focused conversation with OAF to evaluate your next strategic move.

Book a Consultation